Subdivision · Mill-and-Overlay · Reconstruction

Road Surfacing

Subdivision road paving, mill-and-overlay and full reconstruction to City of Edmonton and rural municipality specifications.

No Deposit Required
Pay only when you approve the finished work
Free Written Estimate
Itemised quote delivered same business day
Workmanship Warranty
Plus full manufacturer warranty coverage
Serving Greater Edmonton
Edmonton, Sherwood Park, St. Albert and beyond

Roads built to last twenty years

Road surfacing falls into three categories: new subdivision builds (developer needs municipal sign-off), mill-and-overlay (sound base, surface failure), and full reconstruction (structure has failed).

River Valley Contracting works to City of Edmonton standards inside city limits, and to Strathcona County, Parkland County and Leduc County specifications outside.

400 mm granular sub-base, 150 mm HL8 binder course and 50 mm HL3 surface course on subdivision roads. QC density tested on every layer with reports for municipal sign-off.

Get a Free Quote
Road Surfacing in Edmonton
Workmanship Warranty
Backed by full manufacturer guarantee on every install

Everything included in the price

No hidden extras. Every item below is included in your written estimate.

01

Walking survey + cores

Existing surface and base assessment. Recommendation against municipal spec.

02

Schedule + TMP

Built around season constraints. Traffic management plan submitted for closures.

03

Sub-base + base

Granular sub-base and binder course placed in lifts with QC density verified.

04

HL3 surface course

Surface placed by paver and compacted to spec.

05

Curb-and-gutter

Coordinated with paving so the two sections meet correctly.

06

Municipal sign-off

QC reports and material certifications submitted. Engineer or municipal inspector signs off.

Common questions

Which option do I need?

Good cores with surface failure → mill-and-overlay. Failing base → reconstruction. Greenfield → new build to spec.

Do you handle municipal sign-off?

Yes. River Valley Contracting works directly with the municipal engineer and submits QC density reports and material certifications.

Can the road stay open?

Mill-and-overlay: single-lane closures with flag persons. New builds and reconstructions: full closures with traffic management plan.

How long does a typical job take?

500 m mill-and-overlay: 3 to 5 working days. 500 m new build with curb-and-gutter: 6 to 8 weeks.

Do you work in winter?

Asphalt plants close late October to early April. Paving scheduled for the open season; winter for project planning and curb work.

Acreage roads?

Yes. Rural acreage and farm access roads designed to lighter base than subdivision spec, sized to your loading.

Ready to start your project?

Free written estimate from River Valley Contracting. No deposit. Same business day response.